Keyword      Search in       

Contact
Imprint
Site Map


Qualification and Validation of Equipment and Processes in Laboratories and Manufacturing


Time Table Day 1
08.00 - 08.30  Welcome, Introduction, Presentation of the Speaker
08.30 - 10.00 Regulatory Requirements for Qualification
  • Europe
  • FDA
  • Harmonisation
  • Definitions
10.00 - 11.00 Management of Documents, Documents required
  • Validation Policy
  • Validation master plan
  • Documents for the Performance of Qualification/Validation
  • SOPs
  • Responsibilities
  • Validation Team
  • Presumption for Qualification/Validation
11.00 - 11.15 Break
11.15 - 12.45  General Aspects of Qualification
  • Qualification Phases, DQ, IQ, OQ, PQ
  • Qualification of Existing Systems and Equipment
  • Qualification of Already Existing Systems (Same as above???)
  • Requalification
12.45 - 13.45 Lunch
13.45 - 15.00 Performance of Qualification
  • SOPs needed
  • How to Write a Qualification Plan, Content a Main Points
  • Performance of Qualification
  • Tests
  • Data
  • Content of Documents
  • How to Write a Qualification report, content and Main Points
15.00 - 15.15 Break
15.15 - 16.45 Types of Validation
  • Process
  • Hygiene
  • Cleaning
  • Concurrent
  • Bracketing
  • Matrixing
  • Retrospective
  • Analytic
16.45 - 17.15 Discussion
   
Day 2  
8.30 - 10.00 Performance of Validation
  • SOPs necessary
  • How to Write a Validation Plan
  • Performance of Validation
  • Tests
  • Data
  • Content of Documents
10.00- 10.15 Break
10.15 - 11.15 Guideline on Validation of Analytical Methods
  • Content and Implementation
  • SOPs necessary for Validation
  • How to Write a Validation Plan
  • Methodology and Performance
  • How to write a Validation Report
  • Presumption for Validation
11.15 - 12.30 Support of Qualification and Validation
  • Quality Management System
  • Risk Analysis
  • Calibration/Maintenance
  • Change Management
  • Audit of Qualification and Validation
12.30 - 13.30 Lunch
13.30 - 14.30 External Qualification and Validation
  • Contract Manufacturer
  • Qualification/Validation by Supplier
14.30 - 15.30 Discussion