Old equipment qualification Contribution from NAV written on 7/14/2008 at 11:51
As our API manufacturing site is very old. We don't have any equipment qualification for reactor, dryer, sifter etc. and validatioon of HVAC system in manufacturing area (specially in powder processing area). Any one can tell us how to do HVAC Validation and equipment qualification as we don't have any initial documents with us. It is suffice, if we validate the exisiting HVAC system and equipment qualification as on date. It is acceptable to regulatory authority. Answers to this contribution:
Answering this Contribution:
|