RE: Validation of CMDB and Documentum Contribution from Dick Bonner written on 2/6/2004 at 15:55
Original contribution: Validation of CMDB and Documentum written by Peter Demmink on 1/29/2004 at 10:49) If you are using the term "Validate" as required by CFR 21 Part 11 then validation of non-GMP systems is not required. The use of the systems you describe do not sound as if they fall under this requirement.
Answering this Contribution:
|