RE: stability Contribution from gagandeep kaur written on 7/4/2008 at 10:43
Original contribution: stability written by Rahul on 7/4/2008 at 09:24) for control sample collect double the qty required for testing and for stabilityas per protocol of stability for eg if you are doing acc stability study at intervals 0,1,2,3,4,5 and 6 months then sample qty will be 7x qty req for one testing Answers to this contribution:
Answering this Contribution:
|